§ 11.5-27. Overlength utility pole permits.
The issuance of permits to public utilities for the movement of overlength utility poles are as follows:
(1)
Blanket permits up to an overall length of eighty-five (85) feet may be issued for a period not to exceed twelve (12) months.
(2)
Where new utility construction is involved, blanket permits up to a length of one hundred five (105) feet overall may be issued on a job basis for a period not to exceed twelve (12) months.
(3)
For emergency movements, blanket permits with no weekend or nighttime restrictions may be issued up to a length of one hundred five (105) feet, for a period not to exceed twelve (12) months.
(4)
In each of the above instances an escort will be required where the overall length is in excess of seventy-five (75) feet.
(5)
Where lengths greater than above are necessary, a trip permit may be issued.
(Ord. No. 73-5, § 13)